sewer work Wednesday April 28

Talk about Hang Gliding at Ft Funston and the Fellow Feathers Club.

sewer work Wednesday April 28

Postby Steve Rodrigues » Fri Apr 23, 2010 5:23 pm

This news just in, machinery might create an obstacle on the beach:

Daly City's force main outfall pipe - carrying 6 million gallons of treated sewage per day - coming out of the bluff at Ft. Funston has been severely compromised by the winter storms and they feel it will break if an immediate fix is not done. A pipe break would mean treated sewage would occur on the beach. They propose a fix on Wednesday, April 28.

Emergency Repair Description: Repair damaged section of 33” submarine outfall line located on Fort Funston beach. Two pieces of heavy equipment (Excavator and bulldozer) are required to complete the repairs. The repair will be done by removing a section temporarily and inserting new liner.
Pipe will be put back to existing configuration. Crews and equipment will enter and leave the beach from Avalon Canyon -2.25 miles south of the outfall line - in Daly City and work will be done during low tide. Crews and equipment will remain on the beach.
User avatar
Steve Rodrigues
Site Admin
 
Posts: 723
Joined: Mon May 24, 2004 10:57 pm
Location: Brisbane, California

Date changed to May 13

Postby Steve Rodrigues » Wed Apr 28, 2010 4:43 pm

Due to heavy swells the sewer project has been re-scheduled for May 13.
User avatar
Steve Rodrigues
Site Admin
 
Posts: 723
Joined: Mon May 24, 2004 10:57 pm
Location: Brisbane, California

Sewer work

Postby cliffblack » Sun May 09, 2010 8:16 am

What is the latest, this sounds very interesting
Tom
cliffblack
 
Posts: 103
Joined: Mon May 30, 2005 11:54 am
Location: palo alto

Sewer job re-scheduled for May 13

Postby Steve Rodrigues » Mon May 10, 2010 5:27 pm

They are giving it another try:

There will be four pieces of equipment on site at Fort Funston beginning at 4:00 AM on Thursday, May 13th

1. Grout truck and trailer parked off the asphalt driveway approximately 200’ north of the parking lot. This unit will be fenced in with temporary fencing and tarps underneath the equipment.

2. Two VacCon water supply trucks will be parked in the lot and only a ¾" supply hose to the grout truck will be needed.

There will be 4 pieces of heavy equipment on the beach: 1 - dozer, 1 - Excavator, 2 backhoes
User avatar
Steve Rodrigues
Site Admin
 
Posts: 723
Joined: Mon May 24, 2004 10:57 pm
Location: Brisbane, California


Return to General Discussion